A major revision to the Rapid Update Cycle (RUC) analysis/model system was implemented into operations at the National Centers for Environmental Prediction Center (NCEP) on 17 April 2002. The new RUC version with 20-km horizontal resolution (RUC20) replaces the previous 40-km version of the RUC (RUC40).
Not available
Authors who have authored or contributed to this publication.